Londonderry Office Upgrades to New Cure Room

Team members in our Londonderry Office have been busy this winter with upgrades to our laboratory!

graphic of s.w. cole logo inside New Hampshire outline. Around the lab: Richard smith coordinated an effort to retire our concrete curing tanks and install a new concrete moist room. This week the new cure room became fully operational. We installed a prefabricated panelized walk-in cooler as the room, installed a sump pump to manage the drainage of the water, and installed a "hydrofogger" to provide the moist environment per ASTM C511.